(Tender number: CGN-202003100006)
Tender project location: Heilongjiang Province, Qiqihar City, Iron District
1. Tender conditions
This project Heilongjiang Qiqihar Iron Xiangzhu 100MW price photovoltaic power generation project vision photovoltaic exploration design (Tender number: CGN-202003100006), has passed the review and approval, and the project funds are from the company’s own company. And it has been implemented, and the bidder is Heilongjiang Xiangyang New Dynamics Co., Ltd. This project has bidding conditions and public bidding is now underway.
Sugar baby 2. Project overview and bidding scopeEscort manila
Project size:
The Heilongjiang Qihar Iron and Xiangyuan 100MW square-price photovoltaic power generation project is located in the grassland about 4.2km northeast of the three-point site of the Qihar livestock field in the eastern part of Qihar City. It is about 13.5km away from Qihar City in the west and about 8.2km away from Changqing Village in the south. The center of the project site is: 47.380365 in North, 124.173617 in East, with an altitude of 147-148m, the area is flat, and the landform is mainly unused.
This project has a planned capacity of 100MW in this period, and all are air station projects. This issue will install 280Wp solar photovoltaic component 401544 blocks, and the component bracket adopts a fixed installation type. The project applies a built-in pressure upgrade station (shared with the Internet Fengli Electric Power Project at the 150MW price of Iron Xiangxiang New Power) and connect it to the local network at a 220kV voltage level.
Tender scope:
Sugar babyThis bidding project does not plan for segments. The content of this bidding is:
Including but not limited to:
Photovoltaic power station detailed survey (including ground survey, test), constructionPinay escortTender document editing, construction drawing design, completion drawing editing, and related consultation services (such as planning suggestions, online planning suggestions, etc.), on-site services, technical services (including but not limited to: participation in evaluations, reviews, technical contacts, and application for QC technical results are all inferior., Ping An Design Special, project acceptance, etc.).
The scope of this bidding is not Escort includes: connection system planning, upgrade station department expansion and system design of system maintenance and safety automation, adjustment automation, power consumption measurement and other systems.
Sugar baby design scope: This project applies to the built upgrade stationsSugar daddy (and Sugar babyIron and Electrotechnical New Power 150MW Price is shared on the Internet Fengli Electric Project)Sugar daddy, 220kV sending line and counter-end partition project are not bid in this project, 220kV sending line and pressure upgrade stationSugar daddy, 220kV sending line and pressure upgrade stationSugar All designs in photovoltaic areas other than daddy are within the bidding scope.
Progress request:
(1) The feasibility study and detailed survey tasks will be carried out immediately after the design is set, and the feasibility study and detailed survey tasks will be completed within 21 tasks;
(2) After the feasibility study is reviewed, the construction bid documents will be compiled, and the five tasks will be completed within 5 tasks will be completed;
(3) Construction drawing design progress Escort should meet the requirements of equipment ordering plans and on-site construction progress;
(4) Complete the completion drawing preparation task within 1 month after the completion of the project.
III. Investor qualifications
1. Basic qualifications: an independent legal person with a registered domestic registration and holds a useful legal person business license issued by the Political Management Department of the Industrial and Commercial Bank.
2. Qualification request:
The bidder must have the following qualifications for this bid:
(1) Engineering exploration quality request: Engineering exploration (civil engineering, engineering measurement) professional level A and above.
(2) Engineering design qualification request: New Power Industry Power Industry New Power Professional Level A and above.
3. Industry Results: In the past three years (2017-2019), the bidder should have had extensive experience in the exploration and design of photovoltaic projects and undertaken The professional performance of engineering exploration design for five or more photovoltaic projects (based on the contract time).
4. Project responsible person: a job certificate document orThe bidder certifies his elderly care for his insurance.
5. No joint bidding is accepted and subcontracting is allowed.
6. If the bidder has not been accepted in the following circumstances in the past three years, the bidder shall make a written commitment to the content of the departmental terms in accordance with the bidder’s request.
(1) The bidder will be subject to a winning bid, a serious violation, a serious project quality problem, or any contract will be terminated due to its own injustice.
(2) The bidder is in charge of suspension of business, acceptance of property, destruction, and destruction of property.
IV. Acquisition of bid documents
1. Acquisition time: March 10, 2020 17:00 to March 18, 2020 17:00
2. Acquisition method:
(1) The bidder should invest online on the China National Nuclear Electronics Pinay escort business platform (https://ecp.cgnpc.com.cn) during the sale period of the bid documentsPinay escort business platform (https://ecp.cgnpc.com.cn) href=”https://philippines-sugar.net/”>Sugar baby registration. When registering, you must fill in the authorized bid contact information.
(2) Each set of bidding documents is sold at RMB 500. The bidder shall pay the price (book payment) of the bidding documents during the sale period of the bidding documents based on the above transfer account information, and will not refund after the sale. For bidding items, there is no repaid fee for purchase prices that have been paid for during the first bidding.
Account name: China Guang Nuclear Engineering Co., Ltd.
Account bank: Shenzhen Branch Business Department of China Industrial and Commercial Bank
Account number: 4000023019200399116
(3) The bidder stayed in the laboratory for several days and was dragged to this environment. Ye also took advantage of the rest of the rest who had registered as a member of the China Guangxi E-commerce Platform, and can log in and register directly. Otherwise, you must register as a member of the platform before you can register the topic: maintain a positive attitude and shine. , please refer to the male actors of similar age in the Chinese high school. The other three are middle-aged men. e-commerce platform. If the “Business License” information changes when the bidder registers, please log in to the China National Nuclear E-commerce Platform to change the new information about the member registration information. If the bidder fails to change the new data registration information in time and affects the bidder, the bidder shall bear the responsibility on his own.
(4)After the bidder has paid the price of the bidding documents, he or she needs to pass on the bidding certificate scanned copy on the bidding documents purchase ring of the bidding documents for bidding projects.
(5) After the bidding representative reviews and confirms the bidder’s payment certificate, the bidder will be authorized to download the electronic version of the bidding documents online. If you need a paper version of the bidding document, please contact the bidder and go to the bidding document to obtain the bidding document.
(6) The bidder must complete the relevant tasks of bid registration and purchase bid documents during the bid documents release period. The system will automatically close after the period. The bidder who fails to register and purchase bidding documents in accordance with the above request shall not participate in the bidding. The bidder has the right to refuse his bidding documents. If it has been collected, it shall be processed as an invalid document.
(7) If the bidder fails to register, upload payment certificates, and submits bid registration documents that are not suitable for the request or have a payment error, the bidder shall bear the responsibility on his own.
5. Transfer of bid documents
1. Transfer deadline: 2020 Sugar babyMarch 31, 09:00
2. Recently, a knowledge competition program with a doctoral student is very popular. Submit Pinay escort method: This project adopts electronic bidding, and there is no need to submit paper bidding documents. For details on the submission method, please see the bidding documents Chapter 2 “Tenderers must know”.
The bid documents sent for the period TC: